Solar Subsidy in Jammu and Kashmir: Rooftop Solar Calculator

The solar subsidy in Jammu and Kashmir is up to Rs 94,800 for a 3 kW home: Rs 85,800 central at the special-category rate plus a UT top-up of Rs 3,000 per kW. By March 2026 the UT had paid Rs 3.80 crore to 4,288 consumers, but the Chief Minister told the Assembly that UT payments were being delayed by verification, document checks and portal integration. Expect the central amount first and the UT share later.

Special Category Region — Up to ₹85,800 Central Subsidy
Jammu and Kashmir State Subsidy: ₹3,000/kW (up to 3 kW = max ₹9,000)
DISCOM / Nodal Agency:JAKEDA / JPDCL / KPDCL

Residential Rooftop Solar Estimation

For individual villas, independent homes, and residential houses. Central PM Surya Ghar + Jammu and Kashmir Subsidies.

Area Unit:
kWh
m²

Feasible solar on this roof: 0.00 kW (1 kW requires ~10 m² / 108 ft²)

PM Surya Ghar grants central subsidy up to 3 kW.

Estimation Results (Solar System)

State Policy: Jammu and Kashmir (Special Category)
Est. System Benchmark Cost
₹0

Benchmark @ ₹72,000/kW

Total Government Subsidy0% Off
₹0
Central (PM Surya Ghar): ₹0
Jammu and Kashmir State Subsidy: ₹0
Effective / Net Consumer Cost
₹0

Net amount payable after all central and state subsidies.

Feasible Roof Capacity0.00 kW
Monthly Solar Units~0 kWh
Monthly Bill Savings₹0
Monthly GBI Incentive₹0
Total Monthly Benefit₹0
Payback Period0.0 Years(0 Months)
25-Year Estimated Net Savings
₹0

Assuming 25-year manufacturer panel warranty & current tariffs.

Annual Environmental Impact
0 kg CO₂ Avoided / yr

Equivalent to planting ~0 trees every year!

Rooftop Solar Calculator Jammu and Kashmir: What It Pre-Fills

This version loads Jammu and Kashmir's central subsidy rate, any state or UT top-up rules and a local cost and generation estimate, so you only enter your monthly units and roof area.

ItemJammu & Kashmir (verify at publish)
Central subsidyUp to Rs 85,800
UT top-upRs 3,000/kW
Combined maximumRs 94,800
DISCOMsKPDCL (Kashmir), JPDCL (Jammu)
UT paid so farRs 3.80 crore to 4,288 consumers (March 2026)
Homes benefitingNearly 39,000 (July 2026, AIR)

J&K UT Solar Subsidy: The Stack

SystemCentralUTCombined
1 kWRs 33,000Rs 3,000Rs 36,000
2 kWRs 66,000Rs 6,000Rs 72,000
3 kWRs 85,800Rs 9,000Rs 94,800

KPDCL Solar Subsidy and JPDCL Solar Subsidy: Payment Status

DISCOMConsumers paid UT shareAmount (March 2026)
KPDCL (Kashmir)2,053Rs 1.80 crore
JPDCL (Jammu)2,235Rs 2.00 crore

With about 39,000 homes on the scheme by July 2026, most UT shares were still pending at the March figure.

Solar Panel Price in Jammu and Kashmir With Subsidy

Line3 kW home
Planning cost (Rs 72,000/kW)Rs 2,16,000
Central subsidyminus Rs 85,800
UT top-upminus Rs 9,000
Net costabout Rs 1,21,200

Honest Trade-Offs in J&K

  • The UT share is small and slow to arrive.
  • Kashmir winters bring snow, fog and short days, lowering output.
  • Upside: J&K has strong uptake and the higher central rate; it declared 20 model solar villages.

Who Solar Suits in J&K

FitProfile
Strong fitJammu division homes with open roofs and 250+ units
Marginal fitKashmir valley homes with long winter shade
Not a fitRoofs that cannot carry snow load

FAQs: Solar Subsidy in Jammu and Kashmir

How much is the solar subsidy in Jammu and Kashmir?

Up to Rs 94,800 for 3 kW: Rs 85,800 central plus Rs 9,000 from the UT.

What is the J&K UT solar subsidy?

Rs 3,000 per kW on top of the central subsidy, paid by the UT through KPDCL and JPDCL.

Why is my J&K UT subsidy delayed?

The Chief Minister said in March 2026 that verification, document scrutiny and portal integration were holding up UT payments.

What is the KPDCL solar subsidy?

KPDCL handles rooftop solar for the Kashmir division, including feasibility, net metering and the UT share.

What is the JPDCL solar subsidy?

JPDCL handles rooftop solar for the Jammu division in the same way.

How many J&K homes have rooftop solar?

Nearly 39,000 households had benefited by July 2026, according to All India Radio.

How much does 3 kW cost in J&K after subsidy?

About Rs 1.21 lakh at a planning cost of Rs 72,000 per kW.

Where do I apply in Jammu and Kashmir?

On pmsuryaghar.gov.in with your KPDCL or JPDCL consumer number.