Solar Subsidy in Madhya Pradesh: Rooftop Solar Calculator

The solar subsidy in Madhya Pradesh is the central PM Surya Ghar amount: up to Rs 78,000 for 3 kW or more, with no separate state top-up. The bigger issue in MP in 2026 is cost. Since 1 June 2026, subsidised rooftop systems must use Indian-made solar cells, and MP vendors reported prices rising 30 to 35%, with a 5 kW system costing Rs 40,000 to Rs 50,000 more. Older price lists online no longer reflect what you will pay.

General State — Up to ₹78,000 Central Subsidy
Standard Central PM-SG Subsidy applies
DISCOM / Nodal Agency:MPUVNL / MPPKVVCL / MPMKVVCL

Residential Rooftop Solar Estimation

For individual villas, independent homes, and residential houses. Central PM Surya Ghar + Madhya Pradesh Subsidies.

Area Unit:
kWh
m²

Feasible solar on this roof: 0.00 kW (1 kW requires ~10 m² / 108 ft²)

PM Surya Ghar grants central subsidy up to 3 kW.

Estimation Results (Solar System)

State Policy: Madhya Pradesh (General Category)
Est. System Benchmark Cost
₹0

Benchmark @ ₹65,000/kW

Total Government Subsidy0% Off
₹0
Central (PM Surya Ghar): ₹0
Madhya Pradesh State Subsidy: ₹0
Effective / Net Consumer Cost
₹0

Net amount payable after all central and state subsidies.

Feasible Roof Capacity0.00 kW
Monthly Solar Units~0 kWh
Monthly Bill Savings₹0
Monthly GBI Incentive₹0
Total Monthly Benefit₹0
Payback Period0.0 Years(0 Months)
25-Year Estimated Net Savings
₹0

Assuming 25-year manufacturer panel warranty & current tariffs.

Annual Environmental Impact
0 kg CO₂ Avoided / yr

Equivalent to planting ~0 trees every year!

Rooftop Solar Calculator Madhya Pradesh: What It Pre-Fills

This version of the calculator loads Madhya Pradesh's central subsidy rate, any state top-up rules and a local generation estimate, so you only enter your monthly units and roof area.

ItemMadhya Pradesh (verify at publish)
Central subsidyUp to Rs 78,000
State top-upNone found
Cost changeIndian-cell (DCR) rule from 1 June 2026
DISCOMsMPPKVVCL (West, Indore), MPMKVVCL (Central, Bhopal), MPPoKVVCL (East, Jabalpur)
Nodal agencyMPUVN
ActivityWest MP DISCOM reported Rs 327 crore subsidy disbursed (FPJ)

DCR Solar Cell Rule Cost: Before and After June 2026

Estimate sourceExtra cost3 kW impact
Business Today (industry estimate)about Rs 3,000/kWabout Rs 9,000
Free Press Journal (MP vendors)Rs 8 to Rs 10/WRs 24,000 to Rs 30,000

Sources disagree widely. The difference depends on cell supply: India makes far fewer cells than modules, so prices may ease as new cell plants open. The subsidy amount did not change.

Solar Panel Price in Madhya Pradesh With Subsidy

Line3 kW, low estimate3 kW, high estimate
Pre-June cost (Rs 60,000/kW)Rs 1,80,000Rs 1,80,000
DCR increaseplus Rs 9,000plus Rs 30,000
Central subsidyminus Rs 78,000minus Rs 78,000
Net costRs 1,11,000Rs 1,32,000

Honest Trade-Offs in Madhya Pradesh

  • No state top-up, and higher post-June prices.
  • Some vendors who quoted old prices may delay or renegotiate; get a fixed written price.
  • Upside: strong sunshine across most of MP, and West MP has an active installation base.

Who Solar Suits in Madhya Pradesh

FitProfile
Strong fitIndore, Bhopal, Ujjain homes using 300+ units
Marginal fitLow users facing post-June prices
Not a fitBuyers holding an old quote a vendor will not honour

FAQs: Solar Subsidy in Madhya Pradesh

How much is the solar subsidy in Madhya Pradesh?

Up to Rs 78,000 central for 3 kW or more. We found no separate MP state top-up.

Is there a solar subsidy in MP from the state government?

We found no current state top-up for residential rooftop solar. Homes get the central PM Surya Ghar subsidy.

Why did rooftop solar prices rise in MP?

From 1 June 2026, subsidised systems must use Indian-made cells. MP vendors reported cost increases of 30 to 35%.

How much does the DCR solar cell rule add to cost?

Estimates range from about Rs 3,000 per kW to Rs 8,000 to Rs 10,000 per kW, depending on the source.

Which DISCOM handles rooftop solar in Indore?

MPPKVVCL (West Discom) covers Indore and western MP. Bhopal is under MPMKVVCL and Jabalpur under MPPoKVVCL.

Did the subsidy amount change with the new rule?

No. The central subsidy remains up to Rs 78,000.

How much does 3 kW cost in MP after subsidy?

About Rs 1.11 lakh to Rs 1.32 lakh, depending on how much the cell rule adds.

Where do I apply in Madhya Pradesh?

On pmsuryaghar.gov.in with your DISCOM account number.