Solar Subsidy in West Bengal: Rooftop Solar Calculator

The solar subsidy in West Bengal is up to Rs 78,000 central for 3 kW or more. SC and ST beneficiaries get an extra Rs 5,000 from the state; other homes get the central amount only. PM Surya Ghar barely took off in West Bengal before 2026. The state government that took office that year has pledged a faster rollout, with a target of 2 lakh rooftop systems by March 2027.

General State — Up to ₹78,000 Central Subsidy
West Bengal State Subsidy: ₹5,000 for SC/ST beneficiaries only; other homes get central subsidy only
DISCOM / Nodal Agency:WBREDA / WBSEDCL / CESC

Residential Rooftop Solar Estimation

For individual villas, independent homes, and residential houses. Central PM Surya Ghar + West Bengal Subsidies.

Area Unit:
kWh
m²

Feasible solar on this roof: 0.00 kW (1 kW requires ~10 m² / 108 ft²)

PM Surya Ghar grants central subsidy up to 3 kW.

Estimation Results (Solar System)

State Policy: West Bengal (General Category)
Est. System Benchmark Cost
₹0

Benchmark @ ₹65,000/kW

Total Government Subsidy0% Off
₹0
Central (PM Surya Ghar): ₹0
West Bengal State Subsidy: ₹0
Effective / Net Consumer Cost
₹0

Net amount payable after all central and state subsidies.

Feasible Roof Capacity0.00 kW
Monthly Solar Units~0 kWh
Monthly Bill Savings₹0
Monthly GBI Incentive₹0
Total Monthly Benefit₹0
Payback Period0.0 Years(0 Months)
25-Year Estimated Net Savings
₹0

Assuming 25-year manufacturer panel warranty & current tariffs.

Annual Environmental Impact
0 kg CO₂ Avoided / yr

Equivalent to planting ~0 trees every year!

Rooftop Solar Calculator West Bengal: What It Pre-Fills

This version loads West Bengal's central subsidy rate, any state or UT top-up rules and a local cost and generation estimate, so you only enter your monthly units and roof area.

ItemWest Bengal (verify at publish)
Central subsidyUp to Rs 78,000
State top-upRs 5,000 for SC/ST beneficiaries only
Target2 lakh rooftop systems by March 2027
DISCOMsWBSEDCL (most of state), CESC (Kolkata, Howrah)
Nodal agencyWBREDA

West Bengal SC ST Solar Subsidy: Who Gets What

HouseholdCentralStateCombined (3 kW)
SC/ST beneficiaryRs 78,000Rs 5,000Rs 83,000
All other homesRs 78,000Rs 0Rs 78,000

Solar Subsidy Kolkata: Cost Example

Line3 kW home
Market cost (Rs 65,000/kW)Rs 1,95,000
Central subsidyminus Rs 78,000
Net costRs 1,17,000

Kolkata homes on CESC apply through CESC rather than WBSEDCL.

Honest Trade-Offs in West Bengal

  • Vendor networks were thin until 2026; check that your vendor is empanelled and active.
  • Only SC/ST homes get state money.
  • Dense Kolkata housing means many roofs are shared or shaded.

Who Solar Suits in West Bengal

FitProfile
Strong fitIndependent houses using 300+ units, SC/ST households
Marginal fitLow users in shaded city lanes
Not a fitFlats without roof rights

FAQs: Solar Subsidy in West Bengal

How much is the solar subsidy in West Bengal?

Up to Rs 78,000 central for 3 kW or more. SC and ST beneficiaries get an extra Rs 5,000 from the state.

What is the West Bengal SC ST solar subsidy?

An additional Rs 5,000 for PM Surya Ghar beneficiaries from SC and ST categories, announced in 2026 to promote solar in backward regions.

What is the WBSEDCL solar subsidy process?

Register on pmsuryaghar.gov.in, apply through WBSEDCL for feasibility, install with an empanelled vendor and get the net meter commissioned.

What is the solar subsidy Kolkata homes get?

The same central subsidy. Homes on CESC supply apply through CESC.

Why was PM Surya Ghar slow in West Bengal?

The scheme barely took off before 2026. The current government says it will speed up rollout, while the previous government disputes claims that it neglected solar.

What is West Bengal's rooftop solar target?

Two lakh rooftop systems under PM Surya Ghar by March 2027.

How much does 3 kW cost in West Bengal after subsidy?

About Rs 1.17 lakh at a market price of Rs 65,000 per kW.

Where do I apply in West Bengal?

On pmsuryaghar.gov.in with your WBSEDCL or CESC consumer number.