Solar Subsidy in Haryana: Rooftop Solar Calculator

The solar subsidy in Haryana is Rs 78,000 central for any eligible home with a 3 kW or larger system. The state adds extra aid only for lower-income families: up to Rs 25,000 per kW (max Rs 50,000) if family income is up to Rs 1.8 lakh, and up to Rs 10,000 per kW (max Rs 20,000) for Rs 1.8 to 3 lakh, on systems up to 2 kW. Households earning above Rs 3 lakh get the central subsidy only.

General State — Up to ₹78,000 Central Subsidy
Haryana State Subsidy: Income-based, up to 2 kW only: family income up to ₹1.8 lakh gets ₹25,000/kW or 40% of cost (max ₹50,000); ₹1.8–3 lakh gets ₹10,000/kW or 20% of cost (max ₹20,000); above ₹3 lakh gets none
DISCOM / Nodal Agency:HAREDA / DHBVN / UHBVN

Residential Rooftop Solar Estimation

For individual villas, independent homes, and residential houses. Central PM Surya Ghar + Haryana Subsidies.

Area Unit:
kWh
m²

Feasible solar on this roof: 0.00 kW (1 kW requires ~10 m² / 108 ft²)

PM Surya Ghar grants central subsidy up to 3 kW.

State aid applies to the first 2 kW only and is first-come, first-served.

Estimation Results (Solar System)

State Policy: Haryana (General Category)
Est. System Benchmark Cost
₹0

Benchmark @ ₹65,000/kW

Total Government Subsidy0% Off
₹0
Central (PM Surya Ghar): ₹0
Haryana State Subsidy: ₹0
Effective / Net Consumer Cost
₹0

Net amount payable after all central and state subsidies.

Feasible Roof Capacity0.00 kW
Monthly Solar Units~0 kWh
Monthly Bill Savings₹0
Monthly GBI Incentive₹0
Total Monthly Benefit₹0
Payback Period0.0 Years(0 Months)
25-Year Estimated Net Savings
₹0

Assuming 25-year manufacturer panel warranty & current tariffs.

Annual Environmental Impact
0 kg CO₂ Avoided / yr

Equivalent to planting ~0 trees every year!

Rooftop Solar Calculator Haryana: What It Pre-Fills

This version of the calculator loads Haryana's central subsidy rate, any state top-up rules and a local generation estimate, so you only enter your monthly units and roof area. Pick your family income band to see the state aid you may qualify for.

ItemHaryana (verify at publish)
Central subsidyUp to Rs 78,000
State aid, income up to Rs 1.8 lakhRs 25,000/kW or 40% of cost, lower of the two, up to 2 kW
State aid, income Rs 1.8 to 3 lakhRs 10,000/kW or 20% of cost, lower of the two, up to 2 kW
State aid, income above Rs 3 lakhNone
Income proofParivar Pehchan Patra (PPP)
DISCOMsUHBVN (north), DHBVN (south)
Nodal agencyHAREDA

Haryana Solar Subsidy Antyodaya: The Income Bands Explained

This is the single biggest point of confusion online. Some pages say Haryana has no state subsidy; others say everyone gets Rs 10,000 per kW. Neither is right. The State Financial Assistance (SFA) set out in DHBVN Sales Circular D-20/2024 (17 July 2024) depends on family income.

Family income (per PPP)State aid ruleMax state aidTotal at 2 kW
Up to Rs 1.8 lakhRs 25,000/kW or 40% of billed cost per kW, lowerRs 50,000Rs 1,10,000
Rs 1.8 to 3 lakhRs 10,000/kW or 20% of billed cost per kW, lowerRs 20,000Rs 80,000
Above Rs 3 lakhNoneRs 0Rs 60,000

Conditions reported for the state aid include a domestic connection with sanctioned load up to 2 kW. Funds are first-come, first-served. Verify the latest circular with your DISCOM at publish, as at least one source claims the scheme was revised.

Solar Panel Price in Haryana With Subsidy

Line3 kW, income above Rs 3 lakh2 kW, income up to Rs 1.8 lakh
System cost (Rs 65,000/kW)Rs 1,95,000Rs 1,30,000
Central subsidyminus Rs 78,000minus Rs 60,000
State aidRs 0minus Rs 50,000 (Rs 25,000/kW cap applies)
Net costRs 1,17,000about Rs 20,000

Note the 40% rule: at Rs 65,000/kW, 40% is Rs 26,000/kW, which is above Rs 25,000, so the Rs 25,000/kW cap applies. If your vendor bills below about Rs 62,500/kW, the 40% figure becomes the lower one and state aid falls.

How to Apply in Haryana

  1. Register on pmsuryaghar.gov.in with your UHBVN or DHBVN account number.
  2. If you qualify for state aid, keep your PPP ready, as income is verified through it.
  3. Choose an empanelled vendor and get DISCOM feasibility.
  4. Install, then the DISCOM installs the net meter and inspects.
  5. Central subsidy is paid to your bank. State aid is processed through the DISCOM.

Honest Trade-Offs in Haryana

  • Most middle-class homes in Gurugram and Faridabad get the central subsidy only.
  • State aid is capped at 2 kW, so a low-income family installing 3 kW gets no extra state money for the third kW.
  • First-come, first-served funding means the state aid can run out.
  • Power cuts in parts of rural Haryana make battery backup worth costing in. See Adwin's inverter batteries.

Who Solar Suits in Haryana

FitProfile
Strong fitIncome up to Rs 1.8 lakh with own roof (near-free 2 kW), or high-consumption urban homes
Marginal fitLow consumption above the income limit
Not a fitNo own connection or roof

FAQs: Solar Subsidy in Haryana

How much is the solar subsidy in Haryana?

Every eligible home gets up to Rs 78,000 central subsidy. Families with income up to Rs 3 lakh can get up to Rs 20,000 or Rs 50,000 extra from the state, depending on their income band.

Does Haryana give a state subsidy to everyone?

No. State aid is limited to families with annual income up to Rs 3 lakh, verified through the Parivar Pehchan Patra. Others get the central subsidy only.

What is the Haryana solar subsidy for Antyodaya families?

Families with income up to Rs 1.8 lakh get Rs 25,000 per kW or 40% of cost, whichever is lower, for up to 2 kW. That is a maximum of Rs 50,000.

Which DISCOM do I apply through in Haryana?

UHBVN in the northern districts and DHBVN in the southern districts, including Gurugram and Faridabad.

Does a 3 kW system get more state aid in Haryana?

No. State aid stops at 2 kW. The third kW gets only the central Rs 18,000.

What is the HAREDA solar subsidy?

HAREDA is the state renewable energy agency. Applications run through the national portal and your DISCOM.

Is the Haryana state aid always available?

It is first-come, first-served with a limited budget, so it can close before the central scheme does.

How long does a Haryana installation take?

Timelines vary by DISCOM workload. Ask your vendor for recent commissioning times in your district.