At a Glance
| What you want to know | Quick answer (verify at publish) |
|---|
| Maximum central subsidy | Rs 78,000 (3 kW or above) |
| Maximum in special-category states | Rs 85,800 |
| Subsidy beyond 3 kW | None. A 5 kW or 10 kW home gets the same Rs 78,000 |
| Highest combined subsidy (general states) | Rs 1,08,000 (Delhi, Uttar Pradesh, Chhattisgarh) |
| Roof area needed | About 10 sq m (108 sq ft) of shadow-free roof per kW |
| Typical generation | Roughly 3.5 to 4.5 units per kW per day, varies by state and season |
| Who applies | Residential owners with their own electricity connection, via pmsuryaghar.gov.in |
| Scheme funding window | Central scheme funded to 31 March 2027 |
How the Rooftop Solar Calculator Works
The calculator runs four steps in order.
- Sizing. It divides your monthly units by expected generation per kW in your state. A home using 300 units a month in a state averaging 120 units per kW per month needs about 2.5 kW, so the tool suggests 3 kW.
- Roof check. It caps the suggestion at what your shadow-free roof can hold, at about 10 sq m per kW. A 25 sq m roof supports about 2.5 kW, whatever your bill says.
- Subsidy. It applies the central slab for your state category, then adds your state's top-up only where you meet its conditions.
- Net cost and payback. It deducts subsidy from a benchmark system cost and divides by your annual bill saving.
The four tabs (Residential, Commercial/Industrial, CGHS single-point, CGHS multi-point) change which subsidy rules apply. Commercial and industrial users get no PM Surya Ghar subsidy at all, so that tab shows cost and payback only.
PM Surya Ghar Subsidy Calculator: The Central Slabs
The central subsidy, called Central Financial Assistance (CFA), is the same in every general-category state. It is calculated in slabs, not as a flat rate per kW.
| System size | General states | Special-category states | Effective subsidy per kW (general) |
|---|
| 1 kW | Rs 30,000 | Rs 33,000 | Rs 30,000 |
| 2 kW | Rs 60,000 | Rs 66,000 | Rs 30,000 |
| 3 kW | Rs 78,000 | Rs 85,800 | Rs 26,000 |
| 5 kW | Rs 78,000 | Rs 85,800 | Rs 15,600 |
| 10 kW | Rs 78,000 | Rs 85,800 | Rs 7,800 |
| Housing society (common areas) | Rs 18,000 per kW | Rs 19,800 per kW | Up to 500 kW, 3 kW per house |
The last column is the number most pages skip. Subsidy per kW falls sharply above 3 kW, so a larger system is worth it only if your consumption justifies it, not to "get more subsidy".
Special-category states and UTs: Uttarakhand, Himachal Pradesh, Jammu & Kashmir, Ladakh, the North Eastern states including Sikkim, Andaman & Nicobar Islands and Lakshadweep.
State Wise Solar Subsidy: Which States Add a Top-Up
This is where most online calculators go wrong. A state top-up is often limited to an income group, a scheme's registered users, or a fixed number of applicants.
| State | State top-up (verify at publish) | Who qualifies | Max combined |
|---|
| Delhi | Rs 10,000/kW, max Rs 30,000, plus generation incentive | All residential | Rs 1,08,000 + GBI |
| Uttar Pradesh | Rs 15,000/kW, max Rs 30,000 | All residential | Rs 1,08,000 |
| Bihar | Rs 10,000/kW, max Rs 20,000 | First 5 lakh consumers, to 31 Mar 2027 | Rs 98,000 |
| Rajasthan | Rs 17,000 flat | Registered free electricity scheme users, 1.1 kW+ | Rs 95,000 |
| Haryana | Up to Rs 50,000 | Family income up to Rs 3 lakh only | Rs 1,10,000 (at 2 kW, lowest income band) |
| Punjab | None confirmed | n/a | Rs 78,000 |
| Uttarakhand | None confirmed after 31 Mar 2026 | n/a | Rs 85,800 |
| Himachal Pradesh | None confirmed | n/a | Rs 85,800 |
| Chhattisgarh | Rs 15,000 (1 kW), Rs 30,000 (larger) | All residential | Rs 1,08,000 |
| Tamil Nadu | Rs 5,000 / 10,000 / 22,000 | Registered from 5 Aug 2026 | Rs 1,00,000 |
| Gujarat | Covers cost above 10% share (5% SC/ST) | Systems up to 2.18 kWp, from 22 Oct 2026 | about Rs 97,000 at 2.18 kW |
| Maharashtra | SMART scheme, 80 to 95% of 1 kW | Homes under 100 units/month | Rs 47,500 (BPL, 1 kW) |
| Telangana | None confirmed | n/a | Rs 78,000 |
| Karnataka | None | n/a | Rs 78,000 |
| Kerala | None | n/a | Rs 78,000 |
| Madhya Pradesh | None found | n/a | Rs 78,000 |
| Nagaland | Rs 20,000 / 40,000 / 50,000 | Residential, via Nagaland Solar Mission | Rs 1,35,800 |
| Assam | Reported Rs 15,000/kW, max Rs 45,000 | Residential (formula unconfirmed) | about Rs 1,30,800 |
| Tripura | Rs 1,000 scheme | Homes under 50 units/month | Near-full cost covered |
| Meghalaya | None found | n/a | Rs 85,800 |
| Mizoram | None found | n/a | Rs 85,800 |
| Manipur | Unconfirmed | n/a | Rs 85,800 |
| Arunachal Pradesh | None found | n/a | Rs 85,800 |
| Sikkim | None found | n/a | Rs 85,800 |
| Ladakh | Rs 20,000/kWp (first 2), Rs 10,000 (third) | Residential | Rs 1,35,800 |
| Odisha | Rs 35,000 to Rs 60,000 at 3 kW (versions differ) | Residential | Rs 1,13,000 to Rs 1,38,000 |
| Jammu & Kashmir | Rs 3,000/kW | Residential (payments delayed) | Rs 94,800 |
| West Bengal | Rs 5,000 | SC/ST beneficiaries only | Rs 83,000 |
| Jharkhand | Unconfirmed | n/a | Rs 78,000 |
| Andaman & Nicobar | None found | n/a | Rs 85,800 |
| Lakshadweep | None found | n/a | Rs 85,800 |
| Andhra Pradesh | Rs 55,000 (SC/ST), Rs 20,000 (BC) | SC/ST and BC households, 2 kW | Free 2 kW (SC/ST) |
| Goa | Up to 50% of benchmark, rates unpublished | Homes, institutions, some businesses | Range shown |
| Chandigarh | Rs 30,000 proposed, not approved | n/a yet | Rs 78,000 today |
| Puducherry | Unconfirmed | n/a | Rs 78,000 |
| DNH and Daman & Diu | None found | n/a | Rs 78,000 |
Other states will be added as their pages go live.
Solar Panel Cost Calculator: Net Cost Worked Example
The calculator uses a benchmark of about Rs 65,000 per kW installed for home systems. This is higher than the older Rs 60,000 planning figure because, from 1 June 2026, net-metered rooftop systems must use solar cells from approved Indian manufacturers (ALMM List-II). Real quotes typically range from Rs 55,000 to Rs 75,000 per kW depending on panel type, structure height and city. Verify at publish.
Example: 3 kW home, general-category state, no top-up
| Line | Amount |
|---|
| System cost (3 kW x Rs 65,000) | Rs 1,95,000 |
| Central subsidy | minus Rs 78,000 |
| Your net cost | Rs 1,17,000 |
| Monthly generation (3 kW x 120 units) | About 360 units |
| Monthly saving at Rs 7 per unit | About Rs 2,520 |
| Annual saving | About Rs 30,240 |
| Simple payback | Rs 1,17,000 / Rs 30,240 = about 3.9 years |
In Delhi or UP, the extra Rs 30,000 top-up brings net cost to Rs 87,000 and payback to about 2.9 years at the same tariff. Payback is longer where tariffs are low or where the state already gives free units, which the state pages explain.
How Much Solar Do I Need?
Start from your units, not your sanctioned load.
| Monthly units | Suggested size | Roof needed | Central subsidy |
|---|
| Up to 150 | 1 to 1.5 kW | 10 to 15 sq m | Rs 30,000 to Rs 45,000 |
| 150 to 300 | 2 to 3 kW | 20 to 30 sq m | Rs 60,000 to Rs 78,000 |
| 300 to 500 | 3 to 4 kW | 30 to 40 sq m | Rs 78,000 |
| Above 500 | 5 kW and above | 50 sq m and above | Rs 78,000 |
Two limits apply. Your DISCOM may not allow a system larger than your sanctioned load without a load enhancement. And an on-grid system stops during a power cut for safety, so if outages are frequent, a hybrid system with a battery keeps essentials running. Adwin's solar batteries and hybrid inverters are built for that case.
Honest Trade-Offs Before You Install
What works in your favour
- The central subsidy is credited directly to your bank account after commissioning.
- Collateral-free bank loans exist for systems up to 3 kW under the scheme. Verify current rates with the bank.
- Net metering credits your surplus units against your bill.
What competitor pages leave out
- On-grid systems switch off during power cuts. Solar alone does not give backup.
- The subsidy needs ALMM-listed, made-in-India (DCR) panels and an empanelled vendor. Cheaper non-DCR panels mean no subsidy.
- Net metering approval can take weeks, and some DISCOMs are slower than others.
- If your state already gives free units (Delhi up to 200, Punjab up to 300, Rajasthan's 150-unit scheme), your bill saving is smaller than the headline suggests.
- Roofs that are shaded, weak or leaking cost extra to prepare.
Is Rooftop Solar a Good Fit for You?
| Fit | Profile |
|---|
| Strong fit | Own house, 250+ units a month, 25+ sq m of open roof, tariff above Rs 6 per unit, state top-up available |
| Marginal fit | 100 to 200 units a month, or a state with free units, or a partly shaded roof |
| Not a fit (for now) | Rented home without owner consent, roof under 10 sq m, no own electricity connection, or planning to sell the house within 2 years |
Rooftop Solar Calculator FAQs
How accurate is this rooftop solar calculator?
It gives an estimate based on benchmark costs, average generation for your state and current subsidy rules. Your final cost depends on the vendor's quote, roof structure and DISCOM charges. Treat the result as a planning figure, then compare it with three empanelled vendor quotes.
Is this a PM Surya Ghar subsidy calculator?
Yes. It applies the PM Surya Ghar central slabs (Rs 30,000 per kW for the first 2 kW, Rs 18,000 for the third) and the higher special-category rates where they apply. It then adds your state top-up only if you meet its conditions.
How does the solar subsidy calculator handle state top-ups?
It adds the state amount only where it applies to all residential consumers, such as Delhi and Uttar Pradesh. For conditional schemes like Haryana (income-based) or Rajasthan (scheme beneficiaries only), it shows the top-up as an option you can switch on.
Will a bigger system get me more subsidy?
No. The central subsidy stops at 3 kW. A 10 kW home system gets the same Rs 78,000 as a 3 kW one, so size for your consumption, not the subsidy.
Can commercial or industrial buildings get the subsidy?
No. PM Surya Ghar covers residential consumers and housing society common areas only. Businesses can still benefit through bill savings and tax depreciation, which the Commercial/Industrial tab estimates.
How much roof space do I need for 3 kW?
About 30 sq m (around 325 sq ft) of shadow-free roof. Water tanks, stairwell rooms and nearby buildings that cast shade reduce usable area.
Does solar work during a power cut?
A standard on-grid system shuts down during a grid outage for safety reasons. For backup, you need a hybrid system with a battery.
How long does the subsidy take to arrive?
It is paid after the DISCOM inspects and commissions the system and you submit your bank details on the portal. Timelines vary by state and DISCOM, so ask your vendor about recent cases in your area.
What is the last date for PM Surya Ghar?
The central scheme is funded until 31 March 2027. State top-ups have their own budgets and can close earlier, so apply early.
Your rooftop solar calculator result is a starting point. Pick your state above for the exact top-up rules, DISCOM process and worked cost example, or talk to Adwin about a hybrid system that keeps your home running during power cuts. More tools are on the Adwin tools page.