Rooftop Solar Calculator

Use this rooftop solar calculator to find the right system size for your home, the PM Surya Ghar subsidy you qualify for, your state's top-up (if any), and your net cost after subsidy. Enter your monthly units and roof area. A 3 kW home system qualifies for up to Rs 78,000 central subsidy in most states and up to Rs 85,800 in hill and North Eastern states, and some states add more on top.

Choose your state or UT to see its subsidy rules. Until then, results use the standard central subsidy only.

Residential Rooftop Solar Estimation

For individual villas, independent homes, and residential houses. Central PM Surya Ghar + your state Subsidies.

Area Unit:
kWh
m²

Feasible solar on this roof: 0.00 kW (1 kW requires ~10 m² / 108 ft²)

PM Surya Ghar grants central subsidy up to 3 kW.

Estimation Results (Solar System)

State Policy: Choose a state
Est. System Benchmark Cost
₹0

Benchmark @ ₹65,000/kW

Total Government Subsidy0% Off
₹0
Central (PM Surya Ghar): ₹0
your state State Subsidy: ₹0
Effective / Net Consumer Cost
₹0

Net amount payable after all central and state subsidies.

Feasible Roof Capacity0.00 kW
Monthly Solar Units~0 kWh
Monthly Bill Savings₹0
Monthly GBI Incentive₹0
Total Monthly Benefit₹0
Payback Period0.0 Years(0 Months)
25-Year Estimated Net Savings
₹0

Assuming 25-year manufacturer panel warranty & current tariffs.

Annual Environmental Impact
0 kg CO₂ Avoided / yr

Equivalent to planting ~0 trees every year!

At a Glance

What you want to knowQuick answer (verify at publish)
Maximum central subsidyRs 78,000 (3 kW or above)
Maximum in special-category statesRs 85,800
Subsidy beyond 3 kWNone. A 5 kW or 10 kW home gets the same Rs 78,000
Highest combined subsidy (general states)Rs 1,08,000 (Delhi, Uttar Pradesh, Chhattisgarh)
Roof area neededAbout 10 sq m (108 sq ft) of shadow-free roof per kW
Typical generationRoughly 3.5 to 4.5 units per kW per day, varies by state and season
Who appliesResidential owners with their own electricity connection, via pmsuryaghar.gov.in
Scheme funding windowCentral scheme funded to 31 March 2027

How the Rooftop Solar Calculator Works

The calculator runs four steps in order.

  1. Sizing. It divides your monthly units by expected generation per kW in your state. A home using 300 units a month in a state averaging 120 units per kW per month needs about 2.5 kW, so the tool suggests 3 kW.
  2. Roof check. It caps the suggestion at what your shadow-free roof can hold, at about 10 sq m per kW. A 25 sq m roof supports about 2.5 kW, whatever your bill says.
  3. Subsidy. It applies the central slab for your state category, then adds your state's top-up only where you meet its conditions.
  4. Net cost and payback. It deducts subsidy from a benchmark system cost and divides by your annual bill saving.

The four tabs (Residential, Commercial/Industrial, CGHS single-point, CGHS multi-point) change which subsidy rules apply. Commercial and industrial users get no PM Surya Ghar subsidy at all, so that tab shows cost and payback only.

PM Surya Ghar Subsidy Calculator: The Central Slabs

The central subsidy, called Central Financial Assistance (CFA), is the same in every general-category state. It is calculated in slabs, not as a flat rate per kW.

System sizeGeneral statesSpecial-category statesEffective subsidy per kW (general)
1 kWRs 30,000Rs 33,000Rs 30,000
2 kWRs 60,000Rs 66,000Rs 30,000
3 kWRs 78,000Rs 85,800Rs 26,000
5 kWRs 78,000Rs 85,800Rs 15,600
10 kWRs 78,000Rs 85,800Rs 7,800
Housing society (common areas)Rs 18,000 per kWRs 19,800 per kWUp to 500 kW, 3 kW per house

The last column is the number most pages skip. Subsidy per kW falls sharply above 3 kW, so a larger system is worth it only if your consumption justifies it, not to "get more subsidy".

Special-category states and UTs: Uttarakhand, Himachal Pradesh, Jammu & Kashmir, Ladakh, the North Eastern states including Sikkim, Andaman & Nicobar Islands and Lakshadweep.

State Wise Solar Subsidy: Which States Add a Top-Up

This is where most online calculators go wrong. A state top-up is often limited to an income group, a scheme's registered users, or a fixed number of applicants.

StateState top-up (verify at publish)Who qualifiesMax combined
DelhiRs 10,000/kW, max Rs 30,000, plus generation incentiveAll residentialRs 1,08,000 + GBI
Uttar PradeshRs 15,000/kW, max Rs 30,000All residentialRs 1,08,000
BiharRs 10,000/kW, max Rs 20,000First 5 lakh consumers, to 31 Mar 2027Rs 98,000
RajasthanRs 17,000 flatRegistered free electricity scheme users, 1.1 kW+Rs 95,000
HaryanaUp to Rs 50,000Family income up to Rs 3 lakh onlyRs 1,10,000 (at 2 kW, lowest income band)
PunjabNone confirmedn/aRs 78,000
UttarakhandNone confirmed after 31 Mar 2026n/aRs 85,800
Himachal PradeshNone confirmedn/aRs 85,800
ChhattisgarhRs 15,000 (1 kW), Rs 30,000 (larger)All residentialRs 1,08,000
Tamil NaduRs 5,000 / 10,000 / 22,000Registered from 5 Aug 2026Rs 1,00,000
GujaratCovers cost above 10% share (5% SC/ST)Systems up to 2.18 kWp, from 22 Oct 2026about Rs 97,000 at 2.18 kW
MaharashtraSMART scheme, 80 to 95% of 1 kWHomes under 100 units/monthRs 47,500 (BPL, 1 kW)
TelanganaNone confirmedn/aRs 78,000
KarnatakaNonen/aRs 78,000
KeralaNonen/aRs 78,000
Madhya PradeshNone foundn/aRs 78,000
NagalandRs 20,000 / 40,000 / 50,000Residential, via Nagaland Solar MissionRs 1,35,800
AssamReported Rs 15,000/kW, max Rs 45,000Residential (formula unconfirmed)about Rs 1,30,800
TripuraRs 1,000 schemeHomes under 50 units/monthNear-full cost covered
MeghalayaNone foundn/aRs 85,800
MizoramNone foundn/aRs 85,800
ManipurUnconfirmedn/aRs 85,800
Arunachal PradeshNone foundn/aRs 85,800
SikkimNone foundn/aRs 85,800
LadakhRs 20,000/kWp (first 2), Rs 10,000 (third)ResidentialRs 1,35,800
OdishaRs 35,000 to Rs 60,000 at 3 kW (versions differ)ResidentialRs 1,13,000 to Rs 1,38,000
Jammu & KashmirRs 3,000/kWResidential (payments delayed)Rs 94,800
West BengalRs 5,000SC/ST beneficiaries onlyRs 83,000
JharkhandUnconfirmedn/aRs 78,000
Andaman & NicobarNone foundn/aRs 85,800
LakshadweepNone foundn/aRs 85,800
Andhra PradeshRs 55,000 (SC/ST), Rs 20,000 (BC)SC/ST and BC households, 2 kWFree 2 kW (SC/ST)
GoaUp to 50% of benchmark, rates unpublishedHomes, institutions, some businessesRange shown
ChandigarhRs 30,000 proposed, not approvedn/a yetRs 78,000 today
PuducherryUnconfirmedn/aRs 78,000
DNH and Daman & DiuNone foundn/aRs 78,000

Other states will be added as their pages go live.

Solar Panel Cost Calculator: Net Cost Worked Example

The calculator uses a benchmark of about Rs 65,000 per kW installed for home systems. This is higher than the older Rs 60,000 planning figure because, from 1 June 2026, net-metered rooftop systems must use solar cells from approved Indian manufacturers (ALMM List-II). Real quotes typically range from Rs 55,000 to Rs 75,000 per kW depending on panel type, structure height and city. Verify at publish.

Example: 3 kW home, general-category state, no top-up

LineAmount
System cost (3 kW x Rs 65,000)Rs 1,95,000
Central subsidyminus Rs 78,000
Your net costRs 1,17,000
Monthly generation (3 kW x 120 units)About 360 units
Monthly saving at Rs 7 per unitAbout Rs 2,520
Annual savingAbout Rs 30,240
Simple paybackRs 1,17,000 / Rs 30,240 = about 3.9 years

In Delhi or UP, the extra Rs 30,000 top-up brings net cost to Rs 87,000 and payback to about 2.9 years at the same tariff. Payback is longer where tariffs are low or where the state already gives free units, which the state pages explain.

How Much Solar Do I Need?

Start from your units, not your sanctioned load.

Monthly unitsSuggested sizeRoof neededCentral subsidy
Up to 1501 to 1.5 kW10 to 15 sq mRs 30,000 to Rs 45,000
150 to 3002 to 3 kW20 to 30 sq mRs 60,000 to Rs 78,000
300 to 5003 to 4 kW30 to 40 sq mRs 78,000
Above 5005 kW and above50 sq m and aboveRs 78,000

Two limits apply. Your DISCOM may not allow a system larger than your sanctioned load without a load enhancement. And an on-grid system stops during a power cut for safety, so if outages are frequent, a hybrid system with a battery keeps essentials running. Adwin's solar batteries and hybrid inverters are built for that case.

Honest Trade-Offs Before You Install

What works in your favour

  • The central subsidy is credited directly to your bank account after commissioning.
  • Collateral-free bank loans exist for systems up to 3 kW under the scheme. Verify current rates with the bank.
  • Net metering credits your surplus units against your bill.

What competitor pages leave out

  • On-grid systems switch off during power cuts. Solar alone does not give backup.
  • The subsidy needs ALMM-listed, made-in-India (DCR) panels and an empanelled vendor. Cheaper non-DCR panels mean no subsidy.
  • Net metering approval can take weeks, and some DISCOMs are slower than others.
  • If your state already gives free units (Delhi up to 200, Punjab up to 300, Rajasthan's 150-unit scheme), your bill saving is smaller than the headline suggests.
  • Roofs that are shaded, weak or leaking cost extra to prepare.

Is Rooftop Solar a Good Fit for You?

FitProfile
Strong fitOwn house, 250+ units a month, 25+ sq m of open roof, tariff above Rs 6 per unit, state top-up available
Marginal fit100 to 200 units a month, or a state with free units, or a partly shaded roof
Not a fit (for now)Rented home without owner consent, roof under 10 sq m, no own electricity connection, or planning to sell the house within 2 years

Rooftop Solar Calculator FAQs

How accurate is this rooftop solar calculator?

It gives an estimate based on benchmark costs, average generation for your state and current subsidy rules. Your final cost depends on the vendor's quote, roof structure and DISCOM charges. Treat the result as a planning figure, then compare it with three empanelled vendor quotes.

Is this a PM Surya Ghar subsidy calculator?

Yes. It applies the PM Surya Ghar central slabs (Rs 30,000 per kW for the first 2 kW, Rs 18,000 for the third) and the higher special-category rates where they apply. It then adds your state top-up only if you meet its conditions.

How does the solar subsidy calculator handle state top-ups?

It adds the state amount only where it applies to all residential consumers, such as Delhi and Uttar Pradesh. For conditional schemes like Haryana (income-based) or Rajasthan (scheme beneficiaries only), it shows the top-up as an option you can switch on.

Will a bigger system get me more subsidy?

No. The central subsidy stops at 3 kW. A 10 kW home system gets the same Rs 78,000 as a 3 kW one, so size for your consumption, not the subsidy.

Can commercial or industrial buildings get the subsidy?

No. PM Surya Ghar covers residential consumers and housing society common areas only. Businesses can still benefit through bill savings and tax depreciation, which the Commercial/Industrial tab estimates.

How much roof space do I need for 3 kW?

About 30 sq m (around 325 sq ft) of shadow-free roof. Water tanks, stairwell rooms and nearby buildings that cast shade reduce usable area.

Does solar work during a power cut?

A standard on-grid system shuts down during a grid outage for safety reasons. For backup, you need a hybrid system with a battery.

How long does the subsidy take to arrive?

It is paid after the DISCOM inspects and commissions the system and you submit your bank details on the portal. Timelines vary by state and DISCOM, so ask your vendor about recent cases in your area.

What is the last date for PM Surya Ghar?

The central scheme is funded until 31 March 2027. State top-ups have their own budgets and can close earlier, so apply early.

Your rooftop solar calculator result is a starting point. Pick your state above for the exact top-up rules, DISCOM process and worked cost example, or talk to Adwin about a hybrid system that keeps your home running during power cuts. More tools are on the Adwin tools page.

Solar Rooftop & Subsidy FAQs

Got questions about PM Surya Ghar subsidies, installation, or net metering? We have you covered.

How is the PM Surya Ghar subsidy credited?

The central subsidy is credited directly via Direct Benefit Transfer (DBT) to your Aadhaar-linked bank account within 30 days of DISCOM inspection and net-meter commissioning.

What are DCR / ALMM modules and why are they mandatory?

Domestic Content Requirement (DCR) means both the solar cells and modules must be manufactured in India. MNRE mandates DCR and ALMM compliance to qualify for any government subsidy.

Why do North-East & Special Category states receive higher subsidy?

States with rugged terrain, high transport costs, or strategic remote geography (North-East, J&K, Ladakh, HP, Uttarakhand, Islands) receive ₹33,000/kW (first 2 kW) + ₹19,800 (3rd kW), capped at ₹85,800 instead of ₹78,000.

What is the Generation-Based Incentive (GBI) in Delhi?

Under the Delhi Solar Policy, domestic consumers receive ₹3.00/unit (≤3 kW) and ₹2.00/unit (3-10 kW) on total solar energy generated for 5 years, directly credited on the electricity bill.

Can Group Housing Societies (CGHS) claim subsidies?

Yes! Group Housing Societies and RWAs can claim ₹18,000/kW for common facilities (elevators, water pumping, common lights) up to 500 kW capacity under the PM Surya Ghar scheme.

How does Adwin assist with approvals & warranties?

Adwin provides complete turnkey service: site feasibility survey, Tier-1 DCR solar panels with 25-year performance warranty, inverters, DISCOM net-metering approvals, and full subsidy documentation.